61-6411-39 Batasi Colok Gage H7φ 13 LP13-H7
Fitur
- A pair of gauges with an outer shape based on the maximum and minimum allowable dimensions to ensure compatibility between the hole and shaft fit
- Check the accuracy of the hole diameter at the through and stop sides.
Spec
- kelas H7
- Hardness HV 660 hingga 780
- materi: Bagian Pengukur: Peralatan dari baja karbon, Bagian Perhiasan: Aluminium
- standar: φ 13
- Pemeriksaan diameter lubang
- Massa Badan: 60 g
| Perintah No. | 61-6411-39 | |
|---|---|---|
| Model No. | LP13-H7 | |
| Kode JAN | 4975846091108 | |
| Harga standar |
JPY: 11,000
USD: 68.95
Excange rate 1USD= 159.53JPY
Valid price in Japan |
|
| Kuantitas | 1set | |
| Saham di Jepang |
|
|
| Saham Pemasok |
|
|
Variasi produk (ukuran berbeda, spesifikasi berbeda, produk opsional, dll)
| Gambar produk | Perintah No. | Nama | Model No. | Kuantitas | Harga standar | Harga valid di Jepang | Stok [Saham Pemasok] |
|
|---|---|---|---|---|---|---|---|---|
![]() |
61-6411-29 | Batasi Colok Gage H7φ3 LP3-H7 | LP3-H7 | 1set | JPY: 11,200 | USD: 70.21 |
|
|
![]() |
61-6411-30 | Batasi Colok Gage H7φ4 LP4-H7 | LP4-H7 | 1set | JPY: 9,000 | USD: 56.42 |
|
|
![]() |
61-6411-31 | Batasi Colok Gage H7φ5 LP5-H7 | LP5-H7 | 1set | JPY: 8,400 | USD: 52.66 |
|
|
![]() |
61-6411-32 | Batasi Colok Gage H7φ6 LP6-H7 | LP6-H7 | 1set | JPY: 7,900 | USD: 49.52 |
|
|
![]() |
61-6411-33 | Batasi Colok Gage H7φ7 LP7-H7 | LP7-H7 | 1set | JPY: 7,900 | USD: 49.52 |
|
|
![]() |
61-6411-34 | Batasi Colok Gage H7φ8 LP8-H7 | LP8-H7 | 1set | JPY: 7,900 | USD: 49.52 |
|
|
![]() |
61-6411-35 | Batasi Colok Gage H7φ9 LP9-H7 | LP9-H7 | 1set | JPY: 8,400 | USD: 52.66 |
|
|
![]() |
61-6411-36 | Batasi Colok Gage H7φ 10 LP10-H7 | LP10-H7 | 1set | JPY: 9,000 | USD: 56.42 |
|
|
![]() |
61-6411-37 | Batasi Colok Gage H7φ 11 LP11-H7 | LP11-H7 | 1set | JPY: 11,000 | USD: 68.95 |
|
|
![]() |
61-6411-38 | Batasi Colok Gage H7φ 12 LP12-H7 | LP12-H7 | 1set | JPY: 11,000 | USD: 68.95 |
|
|
![]() |
61-6411-39 | Batasi Colok Gage H7φ 13 LP13-H7 | LP13-H7 | 1set | JPY: 11,000 | USD: 68.95 |
|
|
![]() |
61-6411-40 | Batasi Colok Gage H7φ 14 LP14-H7 | LP14-H7 | 1set | JPY: 11,000 | USD: 68.95 |
|
|
![]() |
61-6411-41 | Batasi Colok Gage H7φ 15 LP15-H7 | LP15-H7 | 1set | JPY: 11,000 | USD: 68.95 |
|
|
![]() |
61-6411-42 | Batasi Colok Gage H7φ 16 LP16-H7 | LP16-H7 | 1set | JPY: 12,000 | USD: 75.22 |
|
|
![]() |
61-6411-43 | Batasi Colok Gage H7φ 17 LP17-H7 | LP17-H7 | 1set | JPY: 12,000 | USD: 75.22 |
|
|
![]() |
61-6411-44 | Batasi Colok Gage H7φ 18 LP18-H7 | LP18-H7 | 1set | JPY: 12,000 | USD: 75.22 |
|
|
![]() |
61-6411-45 | Batasi Colok Gage H7φ 19 LP19-H7 | LP19-H7 | 1set | JPY: 12,000 | USD: 75.22 |
|
|
![]() |
61-6411-46 | Batasi Colok Gage H7φ 20 LP20-H7 | LP20-H7 | 1set | JPY: 12,000 | USD: 75.22 |
|
|
![]() |
61-6411-47 | Batasi Colok Gage H7φ 21 LP21-H7 | LP21-H7 | 1set | JPY: 15,000 | USD: 94.03 |
|
|
![]() |
61-6411-48 | Batasi Gage H7φ 22 LP22-H7 | LP22-H7 | 1set | JPY: 15,000 | USD: 94.03 |
|
|
![]() |
61-6411-49 | Batasi Colok Gage H7φ 23 LP23-H7 | LP23-H7 | 1set | JPY: 15,000 | USD: 94.03 |
|
|
![]() |
61-6411-50 | Batasi Gage H7φ 24 LP24-H7 | LP24-H7 | 1set | JPY: 15,000 | USD: 94.03 |
|
|
![]() |
61-6411-51 | Batasi Gage H7φ 25 LP25-H7 | LP25-H7 | 1set | JPY: 15,000 | USD: 94.03 |
|
|
![]() |
61-6411-52 | Batasi Colok Gage H7φ 26 LP26-H7 | LP26-H7 | 1set | JPY: 17,000 | USD: 106.56 |
|
|
![]() |
61-6411-53 | Batasi Gage H7φ 27 LP27-H7 | LP27-H7 | 1set | JPY: 17,000 | USD: 106.56 |
|
|
![]() |
61-6411-54 | Batasi Gage H7φ 28 LP28-H7 | LP28-H7 | 1set | JPY: 17,000 | USD: 106.56 |
|
|
![]() |
61-6411-55 | Batasi Gage H7φ 29 LP29-H7 | LP29-H7 | 1set | JPY: 17,000 | USD: 106.56 |
|
|
![]() |
61-6411-56 | Batasi Colok Gage H7φ 30 LP30-H7 | LP30-H7 | 1set | JPY: 17,000 | USD: 106.56 |
|
|
![]() |
61-6411-57 | Batasi Colok Gage H7φ 31 LP31-H7 | LP31-H7 | 1set | JPY: 22,000 | USD: 137.91 |
|
|
![]() |
61-6411-58 | Batasi Colok Gage H7φ 32 LP32-H7 | LP32-H7 | 1set | JPY: 22,000 | USD: 137.91 |
|
|
![]() |
61-6411-59 | Batasi Colok Gage H7φ 33 LP33-H7 | LP33-H7 | 1set | JPY: 22,000 | USD: 137.91 |
|
|
![]() |
61-6411-60 | Batasi Colok Gage H7φ 34 LP34-H7 | LP34-H7 | 1set | JPY: 22,000 | USD: 137.91 |
|
|
![]() |
61-6411-61 | Batasi Colok Gage H7φ 35 LP35-H7 | LP35-H7 | 1set | JPY: 22,000 | USD: 137.91 |
|
|
![]() |
61-6411-62 | Batasi Colok Gage H7φ 36 LP36-H7 | LP36-H7 | 1set | JPY: 24,000 | USD: 150.44 |
|
|
![]() |
61-6411-63 | Batasi Colok Gage H7φ 37 LP37-H7 | LP37-H7 | 1set | JPY: 24,000 | USD: 150.44 |
|
|
![]() |
61-6411-64 | Batasi Gage H7φ 38 LP38-H7 | LP38-H7 | 1set | JPY: 26,000 | USD: 162.98 |
|
|
![]() |
61-6411-65 | Batasi Colok Gage H7φ 39 LP39-H7 | LP39-H7 | 1set | JPY: 26,000 | USD: 162.98 |
|
|
![]() |
61-6411-66 | Batasi Colok Gage H7φ 40 LP40-H7 | LP40-H7 | 1set | JPY: 26,000 | USD: 162.98 |
|







































